• Home
  • About Us
  • Services
  • Our Work
  • MODBLT in Action
  • Current Projects
  • Press
  • Contact Us
  • Giving Back
  • More
    • Home
    • About Us
    • Services
    • Our Work
    • MODBLT in Action
    • Current Projects
    • Press
    • Contact Us
    • Giving Back
  • Home
  • About Us
  • Services
  • Our Work
  • MODBLT in Action
  • Current Projects
  • Press
  • Contact Us
  • Giving Back

MODBLT in Action

West Adams, Los Angeles, CA 25-Unit Market Rate Apartments

MODSET and MODBLT working with West Modular to set their first steel modular building in Los Angels. 48 Modules, 25 units, set in 5 days.

VA402 Veterans Supportive Housing Project

Another tandem project with modular logistics and design consulting provided by MODBLT and shipping, staging logistics, craning, setting, structural steel, and roofing provided by MODSET. VA402 will provide 120 supportive housing units for those in need.

1351 N Stanley Avenue

 Modular design consulting and logistics coordination provided by MODBLT for this 4 unit, 16 module luxury townhome project in West Hollywood. MODSET self performed the modular setting, and provided the coordination for shipping and crane logistics.

Life Moves - San Jose

 MODSET is providing shipping logistics, crane services, and self performing setting of 117 modules for supportive housing in San Jose.

Project Spotlight: Urban Infill Multifamily Development

 Learn more about how this project provides a multifamily product that can be replicated throughout LA: https://www.plantprefab.com/press-cen...  Developer: Metros Capital Architect: Lorcan O'Herlihy Architects [LOHA] Modular construction manager: MODBLT General contractor: MID Construction Group 

Life Moves San Jose, CA

Time-lapse: 12 Days, 120 Supportive Housing Units Installed for LifeMoves in San Jose, CA

VA West LA Campus, Building 402

Revolutionizing Housing: Modular Construction for Homeless Veterans on the VA Campus in West Los Angeles with MODSET

1351 N Stanley Ave. West Hollywood, CA

 Modular design consulting and logistics coordination provided by MODBLT for this 4 unit, 16 module luxury townhome project in West Hollywood. MODSET self performed the modular setting, and provided the coordination for shipping and crane logistics.

Mammoth Lakes, CA

 Workforce housing development, 4 each 3-story townhomes (12 modules) set and assembled in 1 day.

315 S Coast HWY 101 Suite U529, Encinitas, CA 92024

MODBLT/MODSET CSLB License #1086972

Powered by